Avoiding Upsizing to 400A When Adding a Second House to a 200A Service
This document is for a watt diet study of a 999 sq ft ADU in Palo Alto. The main house has a 200-amp existing service panel. Planners were asking for an upgrade to 400-amp main-service based on the original load calculations. We were able to show that an upgrade could be avoided.
Redwood Energy has led the design of more than 20,000 units of Zero Net Energy, all-electric affordable housing, and 200 all-electric market rate residences.